Genesis Block — 40 MW Energy Site & Data Center
All projects

Energy & digital infrastructure · Aktau, Mangystau Region, Kazakhstan

Genesis Block — 40 MW Energy Site & Data Center

A fully-permitted 40 MW off-grid energy site with a data center for AI / HPC compute and industrial mining — for sale or strategic partnership.

40 MW
Guaranteed capacity, scalable to 100 MW
4.04¢/kWh
Full energy cost — AI / HPC tariff
5.82¢/kWh
Full energy cost — mining tariff
2.9 ha
Land plot with expansion potential

About the project

Project overview

The asset delivers 40 MW of guaranteed capacity, scalable to 100 MW, on a 2.9 ha plot with confirmed expansion potential. It is designed for a Tier III/IV data center serving HPC, AI clusters or industrial compute, built on 100% in-house autonomous gas generation.

A dual-tariff gas regime introduced in July 2026 splits energy cost between AI/HPC and mining loads — 4.04¢/kWh and 5.82¢/kWh respectively — materially improving AI-cluster economics. The site forms part of a wider 1+ GW portfolio offered under a portfolio-optimization program.

Key points

Numbers, projections and project parameters

Power
40 MW guaranteed, scalable to 100 MW
Energy cost
4.04¢/kWh for AI/HPC · 5.82¢/kWh for mining
Site
2.9 ha in Aktau with expansion land adjacent
Permits
Fully permitted off-grid energy site
Use cases
AI/HPC colocation, industrial mining, hybrid load
Deployment
Phased — first blocks energised within months of closing

Figures follow the project deck and are indicative until confirmed in due diligence.

Why this project

Key investment highlights

01

Fully permitted

Energy site and data center with permits in place — no greenfield development risk.

02

Autonomous generation

100% in-house gas generation, independent of grid constraints.

03

Dual-tariff advantage

Separate AI/HPC and mining tariffs sharply improve compute economics.

04

Port proximity

Aktau location with sea-port access and strong international connectivity.

How Tau Invest Solutions supports this project

We act as your local partner end to end: economic-zone selection, government liaison, permits and approvals, design, construction, commissioning and the optimal financing structure.