Shetpe Wind Project
All projects

Renewable energy · Mangystau Region, Kazakhstan

Shetpe Wind Project

An ongoing wind-power project by Samal EcoEnergy with secured land, bankable wind data and a guaranteed 20-year PPA.

50+20 MW
State auction + corporate PPA
8.79 m/s
Average wind speed on site
19%
Project IRR
20 yrs
Guaranteed PPA offtake

About the project

Project overview

The Shetpe site combines 50 MW awarded through the government renewable auction with a further 20 MW contracted directly with Heidelberg Cement Kazakhstan. Measured average wind speed on site is 8.79 m/s — among the strongest resources in the country.

Land rights, permits, grid, road and city infrastructure are already available, and the project is overseen by an international expert firm. A combined wind–solar configuration can be implemented on the same site.

Key points

Numbers, projections and project parameters

Capacity
50 MW (state auction) + 20 MW (corporate PPA)
Wind resource
8.79 m/s average at hub height
Offtake
20-year guaranteed PPA
Return
19% project IRR
Upside
Hybrid wind + solar configuration on the same grid capacity
Stage
Development advanced — measurement campaign and grid capacity in place

Figures follow the project deck and are indicative until confirmed in due diligence.

Why this project

Key investment highlights

01

Two offtake channels

Government auction capacity plus a direct corporate PPA with an industrial anchor buyer.

02

Verified wind resource

Bankable on-site measurement campaign confirming 8.79 m/s average wind speed.

03

Infrastructure in place

Grid connection, roads, town and industrial customers available at the site.

04

Hybrid potential

Option to add solar capacity for a combined wind–solar park on the same land.

How Tau Invest Solutions supports this project

We act as your local partner end to end: economic-zone selection, government liaison, permits and approvals, design, construction, commissioning and the optimal financing structure.