Aerial view of Petropavlovsk, North Kazakhstan region

Tau Invest Solutions presents an investment opportunity

SEZ «QYZYLJAR» — the industrial and logistics gateway of Northern Kazakhstan

A ready-infrastructure territory on the border with the Russian Federation. 984.3 hectares across eight sub-zones in the North Kazakhstan region, created to develop manufacturing industry and transport and logistics capacity.

Established by Resolution of the Government of the Republic of Kazakhstan No. 758 of 11 October 2019.

984.3 ha
Total SEZ territory
0%
CIT, property tax, VAT, customs duties
18
Priority activity types
2019
Year the SEZ was established

About the project

Eight sub-zones across four districts

The SEZ covers sites within Petropavlovsk city, the Kyzylzhar and Taiynsha districts and the Gabit Musrepov district of the North Kazakhstan region. Management company: SEZ «Qyzyljar» Management LLP.

01362.3 ha

Sub-zones 1–5, Petropavlovsk

Historic industrial sites within the city. Operating residents in electrical equipment and agricultural machinery assembly.

02160 ha

Sub-zone 3, Promyshlennaya St.

Mushroom farm, compost plant, paper and cardboard production. Infrastructure construction worth KZT 55.6 bn under way.

03150 ha

Sub-zone 5 — wood processing cluster

Panel plant with a Qatari investor (Ultradecor). Investment of KZT 90 bn in OSB and laminated chipboard.

04200 ha

Sub-zone 6, Ilyichevka village

New industrial site in the Taiynsha district. Negotiations under way with investors from China.

05200 ha

Sub-zone 7, Novoishimskoye village

Greenfield site in the Gabit Musrepov district, prepared for new manufacturing facilities.

06222 ha

Sub-zone 8, Pribrezhnoye (airport)

International transport and logistics hub in the Kyzylzhar district. Stage one of the expansion.

Sub-zones 2 and 4 are additional industrial sites within the city limits.

Location

Strategic position on the Kazakhstan–Russia border

SEZ «QYZYLJAR» is the entry point to the market of Northern Kazakhstan and the neighbouring regions of the Russian Federation, at the crossing of Asia–Europe routes.

Coordinates
54.87° N, 69.16° E
City
Petropavlovsk
Region
North Kazakhstan
Russian regions bordered
3
Airport logistics hub of SEZ Qyzyljar
  • 1

    Border with the Russian Federation

    The North Kazakhstan region borders three Russian regions — Omsk, Tyumen and Kurgan — giving direct access to a large adjacent market.

  • 2

    Petropavlovsk international airport

    Sub-zone 8 is being developed on the airport site, forming a modern transport and logistics hub on Asia–Europe routes.

  • 3

    Highway and railway

    The Zhezkazgan–Petropavlovsk highway and dedicated railway sidings serving the industrial sub-zones of the SEZ.

  • 4

    Proximity to Kazakhstan's markets

    Neighbouring the Akmola, Kostanay and Pavlodar regions — direct access to the country's domestic markets.

Priority activities

18 activity types approved by the Government

Participant status and the full tax package apply to projects within the priority activity list defined for SEZ «QYZYLJAR».

01

Agro-industry and food processing

  • Food products
  • Fertilisers
  • Veterinary preparations
  • Organic chemicals
02

Pulp and paper industry

  • Paper and cardboard
  • Wood pulp and cellulose
  • Paper products
  • Corrugated cardboard
03

Packaging and containers

  • Paper and cardboard packaging
  • Wooden containers
  • Plastic containers
04

Pharmaceuticals and healthcare

  • Pharmaceutical preparations
  • Basic pharmaceutical products
  • General hospitals
  • Hospital construction
05

Industry and construction materials

  • Construction materials and furniture
  • Machine building
  • Electronics and electrical equipment

Preferences

Terms for a participant of SEZ «QYZYLJAR»

0%
Corporate income tax
0%
Property tax
0%
VAT on imported raw materials
0%
Customs duties on imports

No land use payment for participants. Simplified procedure for hiring foreign labour.

Project categories by investment volume (2026, 1 MCI = KZT 4,325)

Category A
up to 3,000,000 MCI
≈ KZT 13 bn — benefits apply for 7 years
Category B
3,000,000 – 14,500,000 MCI
≈ KZT 13–62.7 bn — benefits apply for 15 years
Category C
from 14,500,000 MCI
≈ from KZT 62.7 bn — benefits apply for 25 years

The category is set by the declared investment volume and determines how long the preferential regime lasts.

Participation formats for investors

1Land plot lease from the SEZ management company
2Turnkey construction and commissioning of a facility
3Lease of production premises
4Joint production with local partners
5Investment into a new or existing production facility
6Contract manufacturing for orders of existing residents

Results

Targets and operating projects

21
SEZ participants
5
Large operating production facilities
8
Sub-zones across 4 districts of the region
55.6 bn
KZT of infrastructure construction under way for 5 projects
148.8 bn
KZT target volume of domestic investment by 2044
Target investment attracted by 2044KZT 250 bn

Flagship projects

Sub-zone 8 — airport logistics hub
222 ha (stage one) · 1,200 new jobs · 50,000 tonnes of cargo turnover per year
$180 m
Sub-zone 5 — wood processing cluster
150 ha · OSB and laminated chipboard · investor Ultradecor Trading Kazakhstan (Qatar)
KZT 90 bn

Operating residents include Petropavlovsk Electrotechnical Plant, ST Assembly, REIMANN (Germany), Kaztechmash Machine Building Plant, Nord Panels and ECO GLADE — 21 SEZ participants in total. Target output of goods and services by 2044: KZT 290 bn.

Wood processing plant producing OSB panels
Industrial construction in Kazakhstan

Infrastructure

Ready infrastructure — you can move in and build

SEZ «QYZYLJAR» has been operating since 2019: utility networks, roads and administrative support are in place on the active sub-zones.

Power supply

Industrial sub-zones are connected to the regional power grid and ready for new production capacity.

Water supply

Centralised water supply is brought to the industrial sites of the active sub-zones.

Sewerage

Wastewater systems are provided across the industrial sub-zones in Petropavlovsk.

Railway siding

Dedicated rail access to the industrial plots for inbound raw materials and outbound product.

Roads

The Zhezkazgan–Petropavlovsk highway and access roads to every active sub-zone.

One-stop shop

The SEZ management company handles participant status and all permits in a single-window regime.

Logistics infrastructure

Who we are

Tau Invest Solutions — your full-cycle partner

One Stop Shop for foreign investors in Kazakhstan.

01

General contracting

We build factories and warehouses of any complexity. 20 years on the Kazakhstan market.

02

Administrative resource

Strong relationships at every level. We resolve matters with state bodies quickly.

03

Financing

Concessional lending through Damu and Baiterek. Full support of the application.

04

SEZ registration

Turnkey participant status in SEZ «Qyzyljar», including land and permitting procedures.

05

Staff relocation

Visas, housing, schooling and healthcare for the investor and their employees.

06

Legal support

Deal structuring, tax optimisation and Kazakhstan law.

07

Supplier sourcing

Local network of raw material, component and service suppliers.

08

Post-investment support

GR, operational matters and business expansion in the region.

Process

The investor path: from idea to launch

Tau Invest Solutions supports you at each of the six stages. One partner — the whole journey.

  1. 01

    First contact

    A meeting with Tau Invest Solutions. Objectives, industry and investment volume.

  2. 02

    Analysis and site selection

    Choosing a plot in SEZ «Qyzyljar». Financial modelling and feasibility study.

  3. 03

    SEZ registration

    Document review (1–2 days), agreement with the management company, entry into the register (3–5 business days).

  4. 04

    Land formalisation

    Allocation scheme, lease agreement and state act — through the single window.

  5. 05

    Construction

    Tau Building Company as general contractor. Quality control throughout.

  6. 06

    Launch and support

    Operational start-up. Post-investment GR support.

A single partner for entering SEZ «QYZYLJAR»

Tau Invest Solutions supports foreign investors at every stage of working with SEZ «Qyzyljar» — from site selection and participant status to general contracting and production launch. We are your single point of contact in Kazakhstan.